Fourth Floor Has Fallen: Difference between revisions
Appearance
Skibidibama (talk | contribs) Created page with "Category:Events {{event|name=Hurricane Idalia|date=August 30th, 2024}} Before Hurricane Idalia, the roofing on the GSSM residential building was largely neglected and desperately required maintenance. This led leaks on fourth floor although infrequent. They caused extensive mold damage. During Hurricane Idalia, Fourth Floor experienced massive leaks and damage to the ceiling tiles. Reportedly, there were leaks coming from water..." |
changed date to correct year |
||
| (2 intermediate revisions by one other user not shown) | |||
| Line 1: | Line 1: | ||
[[Category: Culture]] | |||
[[Category:Events]] | [[Category:Events]] | ||
{{event|name=Hurricane Idalia|date=August 30th, | {{event|name=Hurricane Idalia|date=August 30th, 2023}} | ||
Before Hurricane Idalia, the roofing on the GSSM residential building was largely neglected and desperately required maintenance. This led leaks on fourth floor although infrequent. They caused extensive | Before Hurricane Idalia, the roofing on the GSSM residential building was largely neglected and desperately required maintenance. This led leaks on fourth floor although infrequent. They caused extensive mold damage. | ||
During Hurricane Idalia, | During Hurricane Idalia, experienced massive leaks and damage to the ceiling tiles. Reportedly, there were leaks coming from water sprinklers, ceiling tiles, and the sides of the walls. One ceiling tile on the top floor collapsed. | ||
This event is known as the Fall of the Fourth Floor, and is typically referenced with the phrase, "Fourth Floor has Fallen". | This event is known as the Fall of the Fourth Floor, and is typically referenced with the phrase, "Fourth Floor has Fallen". | ||
Due of the severity of the damage, the school decided to fully replace the roof of the resident halls. | |||
Latest revision as of 05:52, 28 October 2024
{{#invoke:Infobox|infobox}}
Before Hurricane Idalia, the roofing on the GSSM residential building was largely neglected and desperately required maintenance. This led leaks on fourth floor although infrequent. They caused extensive mold damage.
During Hurricane Idalia, experienced massive leaks and damage to the ceiling tiles. Reportedly, there were leaks coming from water sprinklers, ceiling tiles, and the sides of the walls. One ceiling tile on the top floor collapsed.
This event is known as the Fall of the Fourth Floor, and is typically referenced with the phrase, "Fourth Floor has Fallen".
Due of the severity of the damage, the school decided to fully replace the roof of the resident halls.